Dedicated Trucking Intervention

Urgent Situtation:

Production Delays

Reason:

Slow return of dunnage (received on an every 24-hour basis).

The Standridge Solution:

Negotiated with dedicated truck carrier to open a facility closer to the manufacturer.

Results:

  • $30,000 annual cost savings on dedicated lane
  • Dunnage returns went from 24-hours to six
  • Driver dead time decreased by 50%
  • 80% reduction in expedited trucks for lane
© 2017, Standridge Logisitics and Consulting, LLC | All Rights Reserved