Ocean Shipping Intervention

Urgent Situtation:

Assembly line shutdown at two locations.

Reason:

Railroad could not deliver two ocean containers on day needed.

The Standridge Solution:

Locate two available dray trucks in less than two hours, prepare paperwork needed to get containers released from rail head, established and maintained ongoing communications between multiple parties: Standridge, the client, the rail head, broker and trucking company.

Results:

  • No Loss time
  • Materials originally need on Monday was offloaded at manufacturer's location Saturday at 2300 hours CST

Standridge Delivers!

© 2017, Standridge Logisitics and Consulting, LLC | All Rights Reserved